Ciftay has added the Ortaköy HEPP Project, which has an installed capacity of 14.26 MWm, to its renewable energy portfolio in Erzurum by 2020.
Çiftay produces 50% of the iron ore needs of Turkey and meets 20% of its needs.
Çiftay is preparing to increase the installed solar energy capacity of Turkey by 15.6%.
çiftay also offers its services to its customers with the first 5-star hotel with open lobby concept of Turkey and the only one in Ankara.