energy | hydroelectric power plant

Ciftay has added the Ortaköy HEPP Project, which has an installed capacity of 14.26 MWm, to its renewable energy portfolio in Erzurum by 2020.

mining

Çiftay produces 50% of the iron ore needs of Turkey and meets 20% of its needs.

more

energy

Çiftay is preparing to increase the installed solar energy capacity of Turkey by 15.6%.

more

tourism

çiftay also offers its services to its customers with the first 5-star hotel with open lobby concept of Turkey and the only one in Ankara.

more